


A microcement floor in an Oxford kitchen extension or garden room is a thin, trowelled coating laid by Zavoré over the new screed, giving one surface from the units to the garden doors with no grout and no thresholds. Our own artisans install across the UK. On a new extension the finish is the easy part. What decides the result is a screed that is dry right through, joints that are respected and a floor laid in a single pass.
How the layers go down is explained on our microcement installation page, and our page on microcement in Oxford covers bathrooms, stairs and older floors in the city. This guide is about one job only, the floor of a new rear or side extension.
Extensions in Oxford and across Oxfordshire tend to follow a pattern. A Victorian or Edwardian terrace in Jericho, St Clements, Cowley or East Oxford gains a kitchen at the back. A larger villa in Summertown or North Oxford opens its rear rooms to the garden. Houses in Headington and Marston add a rear room with wide glazed doors. In each case the new space is a single open room where cooking, eating and sitting share one floor.
That is the setting where a seamless surface makes sense. There are no tile joints to line up with the units or the doors, the colour runs unbroken to the glass, and the floor can continue into a garden room without a strip at the opening. New extensions also give the finish the base it likes, a rigid slab and screed, which is kinder than the suspended timber floors found in the older part of the same house.
Dry through its full depth. A screed can look and feel dry on the surface while the body of it is still holding water, and that water will try to leave through whatever is laid on top. If a sealed finish goes down too soon, the moisture has nowhere to go.
For that reason we ask about the screed at the survey. What type is it, how thick, when was it poured, and has the building been closed in and ventilated since? Your builder or screed contractor is the right person to confirm when it is ready for a finish, and a moisture reading is better than a guess. We would sooner wait than lay early, and we say so plainly if the floor is not ready.
In general terms, yes, and heated screeds are a familiar feature of new extensions. The points to settle are practical ones. The heating should be installed, tested and run gently by its installer before the finish is laid, so that the screed has already been through a warm and cool cycle. It should be off or low while we work and brought back up gradually afterwards, following the heating installer's guidance. Tell us the system and where the pipes or mats run, and we plan around it at the survey.
Buildings move a little, and a new extension moves differently from the house it is attached to. Where the builder has formed a movement joint in the slab or screed, that joint is carried through the microcement as a neat line, usually placed where a door or a change of room makes it look deliberate. Covering a joint with a rigid coating only moves the crack to somewhere less convenient.
The junction with the original house needs the same thought. If the finish is to run back into an older room with a timber floor, that floor must be stiffened and boarded first, and we will not lay over boards that spring underfoot. Often the cleaner answer is to stop the finish at the line of the old back wall. Door tracks, floor boxes, island plinths and drainage channels should all be fixed before we arrive, because cutting in afterwards leaves a patch.
A wall can be worked panel by panel. A floor cannot, because a join in the middle of the room would show for good. So each coat is taken across the entire floor while it is wet, with enough hands to keep the wet edge alive from one side to the other. We plan the layout, the starting point and the way out of the room before work begins.
For you, this means the room has to be empty and closed to other trades during those stages. Kitchen fitters, electricians and decorators need to be either finished or held back. Units are sometimes fitted first and sometimes after, and we agree that order with you and your builder at the survey. Once the sealer is on, the floor is protected and left to harden before furniture and appliances are moved in.
How many days the blocks take depends on the area, the base and the drying between coats, which is why it is set at the survey. Our nearest centre to Oxford is the London showroom and training centre, which you can visit by appointment to see finishes at full scale.
Sometimes that is the neatest route, because the finish then runs under the plinths. It does mean the fitters must protect the floor carefully. In other rooms it is wiser to lay around fixed units. We look at the layout at the survey and agree the sequence with your builder.
The coating is thin and rigid, so it follows whatever the base does. A sound, dry screed with its movement joints respected gives it what it needs. Where a floor flexes or a joint is buried, cracks follow. That is why we survey first and are frank about what the base needs.
Yes. The sealer is what makes the surface washable, so everyday spills wipe up. Grit carried in from the garden wears any sealed floor, so a good mat at the doors helps. Clean with a mild cleaner and avoid harsh chemicals and scouring pads.
Yes, provided the garden room has a rigid, dry base of its own and any joint between the two structures is carried through. We check both floors at the same survey and match the colour from a single approved sample.
To talk about an extension floor, call 07592 929191 or +44 7592 929191, Monday to Saturday, 9am to 6pm, or email sales@zavore.co.uk with photos, rough measurements and your postcode. A sample board shows you the surface dry before you decide.
For learners in Stockport, Bolton and nearby Greater Manchester towns, how the Manchester course days run, what is provided and how to pl...
CoursesWhy Zavoré limits its Beginner and Advanced decorative plastering courses to six students, what that means for time with the tutor, and w...
Abu DhabiA guide for Abu Dhabi and Al Ain applicators and contractors who want to learn Venetian plaster in person in England, covering which cour...
BirminghamFor West Midlands tradespeople weighing up plastering courses, Zavoré 1 to 1 Training at the Birmingham Academy gives one student three d...
KentWhere learners from Maidstone, Tunbridge Wells and Sevenoaks can take a Zavoré Venetian plastering course, and how to choose between Begi...
FujairahWhat the Zavoré Beginner Course teaches about preparing and finishing walls, and how applicators from Ras Al Khaimah and Fujairah can pla...
Providing luxury finishes for the most prestigious addresses in the world
Venetian plaster, limewash, microcement, tadelakt, metallics, sculptural plaster and gold leaf, supplied and installed by our own team, with Venetian plaster taught at our Birmingham studio.
One list, run by the people who make the material. No noise, and nothing we would not want to read ourselves.
We email as the house has something worth saying, never daily. Unsubscribe from any email, or reply STOP to any text. We never pass your details to anyone.