Venetian plaster sample approval on UAE projects works like this with Zavoré. A sample board is made in the proposed colour and finish, the owner, designer and contractor view it in the actual room at different times of day, one named person signs it off in writing, and that approved board then stays on site as the reference every wall is judged against until handover.
Sample approval sits at the heart of our Venetian plaster installation process, and it applies just as much when you buy material alone through our Venetian plaster supplier page for the UAE. For how we plan projects across the Emirates, see Venetian plastering in the UAE.
Venetian plaster is handmade, so no screen image or printed swatch can show exactly how it will look on your wall. On UAE projects there are often several people involved, such as a villa owner, an interior designer, a main contractor and sometimes a developer or hotel brand team. Without one agreed board, each person can carry a slightly different picture in their head. The approval step gives everyone the same physical reference and avoids disputes once the walls are finished.
Agree at the start who has the final word. On a private villa it is usually the owner, guided by the designer. On a commercial fit out it may be the client representative or the design lead. The contractor needs to know who that person is, and so do we.
Light in the Emirates can be strong and bright through big windows by day, then warm and low under lamps at night. A colour that looks pale at noon may look deeper in the evening. So hold the board against the wall it is meant for, upright, and look again in the morning, in the afternoon and after dark with the room lights on. Check it next to the floor, the joinery and the fabrics. In a majlis or a formal dining room, judge it under the chandelier or the lighting you will actually use.
A short email is enough, but it should be clear. Name the product and finish, the colour reference, the rooms or walls it covers, the sheen and any wax or sealer shown on the board, the date, and the name of the person approving it. Attach a photo of the board in the room. If there are several boards, label each one and match the labels to the approval.
The approved board becomes the project's reference. Keep it on site, wrapped and stored somewhere cool and shaded, and bring it out when each wall is finished so the owner, designer and contractor can compare like with like. At handover, the client can keep it for future repairs or extensions.
Changes happen. If the colour, sheen or finish changes after approval, we make a new board and the approval step starts again. That is not a delay for its own sake. It protects the walls already finished and keeps everyone working to the same reference.
Projects in Dubai follow the same approach, which you can read about on Venetian plastering in Dubai, and the capital is covered on Venetian plastering in Abu Dhabi.
Usually one board per finish and colour. A villa with a polished plaster majlis, marmorino corridors and a limewash bedroom would need three. If you are torn between shades, order two or three boards for the same room and compare them side by side.
Yes, if the owner agrees that the designer has that authority. Put it in writing at the start of the project, so everyone knows whose signature on the board counts.
Yes. We tint material orders to an approved board, just as we do for installations. It gives your applicator and your client the same reference and makes sure the tubs that arrive match what was agreed.
Bring the approved board to the wall and compare them in the same light. Hand finishes vary a little by nature, but the colour and sheen should read the same. That is why the board stays on site throughout.
To start the approval step, order a Venetian plaster sample board, or call +44 7592 929191, Monday to Saturday, 9am to 6pm UK time. You can also email sales@zavore.co.uk with photos of the room, rough measurements and the project address.
How Zavoré installs Venetian plaster in Pearl Jumeirah villas at the fit out stage, from high polish halls to soft marmorino living spaces.
Abu DhabiA stage by stage guide to placing a Venetian plaster project order for the UAE, from the first drawings and sample boards to tinting, tra...
DubaiHow Zavoré installs marmorino in Al Mizhar villas, from majlis walls and halls to preparing older surfaces in an established eastern Duba...
Abu DhabiHow Zavoré quotes delivery for Venetian plaster sent to the UAE, what details to send, what shapes the figure and who handles import duty...
CommercialHow Zavoré installs marmorino in Sharjah restaurants and cafes, from colour and sealing to cleaning near food areas and working around se...
Abu DhabiHow Venetian plaster for UAE orders is tinted to an approved sample board, why every tub is labelled, and why the board should stay on si...
Providing luxury finishes for the most prestigious addresses in the world
Venetian plaster, limewash, microcement, tadelakt, metallics, sculptural plaster and gold leaf, supplied and installed by our own team, with Venetian plaster taught at our Birmingham studio.
One list, run by the people who make the material. No noise, and nothing we would not want to read ourselves.
We email as the house has something worth saying, never daily. Unsubscribe from any email, or reply STOP to any text. We never pass your details to anyone.