


A microcement kitchen joins the worktops, splashback and floor into one continuous surface with no grout lines, and Zavoré installs it in Abu Dhabi villas and apartments with our own artisans, in every emirate. The material is trowelled in thin layers over a primed and reinforced base, then sealed so it can be wiped clean. It suits open plan homes where the kitchen runs straight into the dining and living space.
Our main microcement page lists where the finish works, from bathrooms to stair treads, and microcement in Abu Dhabi explains how we plan jobs across the capital, from the tower apartments to the villas on Saadiyat and Yas.
Many homes in the capital are recent builds with level concrete slabs and open plan layouts, where the kitchen, dining area and living room share one space. Tile breaks that space into a grid, and changes of material at the edge of the kitchen draw a line across the floor. Microcement removes both. The floor can carry on from the living room into the kitchen with no threshold, and the same surface can rise onto the island and the splashback.
It is applied rather than laid, so it follows the shape of what is there. An island with rounded ends, a waterfall edge where the worktop drops to the floor, or a splashback that wraps round a corner can all be finished without a joint.
Worktops. A microcement worktop is built over a rigid, stable base, then finished and sealed. It gives a calm, mineral look with soft clouding through the colour.
Splashbacks. A splashback in the same material as the worktop reads as one piece, and with no grout lines there is less to collect grease. The sealer is what makes it wipeable.
Floors. A whole kitchen floor, or the floor of an entire ground level, can be one surface. The screed beneath must be dry and sound, and any movement joints in the slab are carried through.
Stair treads and walls. Where the kitchen opens onto a stair or a dining wall, the finish can continue there too, so the materials stay consistent across the home.
Microcement is only as good as what lies under it. A floor that moves, a screed that is still damp, or a tile that is loose will all show through in time, so the survey looks hard at the base. Tiled floors and splashbacks can often be covered, provided the tiles are firmly stuck, cleaned of grease and keyed. Loose tiles are lifted first, and the grout lines are filled and the surface reinforced so the joints do not ghost through.
On worktops, the base has to be rigid. On floors, the slab and screed need to be dry and stable. This is why we do not lay microcement as a quick substitute for tiling, and why preparation takes longer than the finishing coats.
The work is planned in blocks of days, so the same artisans take each layer through from primer to the final seal. Because the kitchen is out of use during the work, it helps to plan where the family will cook in the meantime. Most towers and communities have management rules on working hours and deliveries, so check with yours, and if you rent, ask your landlord first. Rooms are air conditioned, and we talk through the building, the climate and how the room is used at the survey.
Once sealed, the surface is washable. Wipe spills with a soft cloth and a mild, neutral cleaner, and avoid harsh abrasives that could scratch the seal. A worktop is the hardest working surface in the house, so treat the seal kindly, and we explain what looking after it means for your kitchen at handover.
Often, yes. The tiles must be firmly stuck, degreased and keyed, with any loose tiles lifted, the grout lines filled and the surface reinforced. We confirm whether your floor or splashback is suitable at the survey, after testing the tiles and looking at the base.
Yes, once sealed. The sealer is what makes microcement washable, so spills wipe away with a soft cloth and a mild cleaner. Abrasive pads and harsh cleaners should be kept away from it, and we give care advice for your kitchen at handover.
It cracks when what lies underneath moves. On a sound, dry, rigid base, with any joints in the slab carried through, it stays sound. That is why most of the effort goes into preparing the base before the first layer goes down.
Yes. Our own artisans install microcement in every emirate, in villas, townhouses and apartments. Email photos, rough measurements and the address, and we will reply with the next steps for your kitchen.
To talk about a microcement kitchen, ring +44 7592 929191 (Monday to Saturday, 9am to 6pm UK time) or email sales@zavore.co.uk with photos of the room, rough measurements and the address. Plans of the kitchen layout help us give useful answers quickly.
A guide to wall art that becomes part of the building in Dubai, comparing bas relief, murals, mosaic and gilding, and explaining how a co...
OmanHow marble paint differs from real polished plaster, and how to order Veneziano Plaster, primer and wax in Oman, tinted to sample and sen...
Abu DhabiUAE decorators can learn genuine limewash on a 3 day 1 to 1 course in England, from reading a wall and mist coats to colour, coats and sa...
BathroomsTadelakt gives a Sharjah villa shower one smooth lime surface with no grout. What it needs behind it, where it belongs, how it is cared f...
Interior DesignersFor Omani design graduates who want to lay the finishes they specify, the in person Beginner Course in England, what it covers and what y...
GildingWhere gold leaf works in Muscat villas and hotels, how gold, silver, copper and imitation leaf differ, and how a gilding job is planned a...
Providing luxury finishes for the most prestigious addresses in the world
Venetian plaster, limewash, microcement, tadelakt, metallics, sculptural plaster and gold leaf, supplied and installed by our own team, with Venetian plaster taught at our Birmingham studio.
One list, run by the people who make the material. No noise, and nothing we would not want to read ourselves.
We email as the house has something worth saying, never daily. Unsubscribe from any email, or reply STOP to any text. We never pass your details to anyone.