ZAVORÉ
ZAVORÉ
✦
Where Artistry Begins
Tracked delivery across the UK and worldwide·Same day and 24 hour delivery available·Venetian plaster tinted to your exact colour·Damaged in transit? We’ll replace it within 24 hours or on the same day·Speak to a specialist · 07592 929191·Residential and commercial projects installed by our own team·Trade accounts · 10% and rewards·Training courses at our studio·Showroom · visit by appointment·Tracked delivery across the UK and worldwide·Same day and 24 hour delivery available·Venetian plaster tinted to your exact colour·Damaged in transit? We’ll replace it within 24 hours or on the same day·Speak to a specialist · 07592 929191·Residential and commercial projects installed by our own team·Trade accounts · 10% and rewards·Training courses at our studio·Showroom · visit by appointment·
Home/The Journal/How a Venetian Plaster Project Order for the UAE Works
20 November 2026

How a Venetian Plaster Project Order for the UAE Works

Textured plaster feature wall above a console, the kind of finish ordered through a Venetian plaster project order for the UAE

A Venetian plaster project order for the UAE works by email from start to finish. You send Zavoré drawings or measurements, we agree finishes and colours on sample boards, you approve them in writing, and we tint, label and pack the full quantity in the UK. The order then goes to your site in Dubai, Abu Dhabi or any emirate on a tracked service, with delivery quoted individually and any import duty or tax paid by the buyer.

Product details sit in our Venetian plaster shop, and the Venetian plaster supplier page for the UAE explains how project supply to the Emirates is handled. Teams who also want our artisans on site can read about Venetian plastering in the UAE, Venetian plaster in Dubai and Venetian plastering in Abu Dhabi.

  • Built for contractors, fit out firms, developers, hotel groups and facilities management teams with their own applicators.
  • Every stage leaves a written record, from the first schedule to the order confirmation.
  • Sample boards come before any tinting, and approval is always in writing.
  • Delivery is quoted individually and the consignment travels tracked.
  • Leftover tinted material is handed over for future repairs.

Who places Venetian plaster project orders for the UAE

Project orders usually come from people buying for many rooms at once. A fit out contractor on a residential tower, a developer finishing a run of townhouses, a hotel group refreshing corridors or a facilities management team keeping several buildings in good order. What they share is an applicator already on the programme and a need for material that arrives correctly coloured, clearly labelled and ready to use.

Designers and architects often start the process before a contractor is appointed. Our page for specifying Zavoré finishes gives them what they need to write a finish into a schedule, so the order that follows has a clear reference behind it.

Stage one, the enquiry and the schedule of finishes

The more complete the first email, the faster everything moves. Send the drawings or a list of rooms with rough wall areas, the finish wanted in each, and the delivery address in the UAE. Photos of the substrate help us comment on primers. If you already have a finishes schedule, attach it, and mark any area that is still undecided.

From that we prepare a first view of products and quantities. Coverage is never a single number, because it depends on the finish, the number of coats and the state of the walls, so we work from your areas, add a margin and confirm the figures with your applicator.

Stage two, sample boards and written approval

For a project, one board rarely does. Many teams order The Sample Box of six boards to compare finishes side by side, or The Sample Case for a wider presentation to an owner or operator. Each approved board becomes the colour reference for its area. We ask for approval in writing, by email, naming the board and the rooms it applies to. That single message protects everyone if questions come up later.

How long does a UAE project order take to prepare

We talk about time in stages rather than dates. The order cannot move to tinting until sample approval is in, and it cannot be sent until the delivery quote is accepted. Building those two decision points into your programme, well ahead of the day the applicator wants to start, is what keeps a fit out on track. Tell us your target start and we plan backwards from it with you.

Stage three, tinting, labelling and packing

Each finish and colour is tinted as one run to its approved board, so walls in the same colour match across floors. Tubs are labelled with the product and the colour reference, and your order confirmation records which areas each finish is for. Waxes, sealers and primers for each area are packed with the plaster they go with. When the consignment lands, count it against your order confirmation before anything is opened.

Stage four, the tracked delivery quote and arrival on site

Delivery is quoted individually once we know the weight, the number of tubs and the exact address. When you accept, the consignment is booked on a tracked service and the tracking details are shared. Import duty or tax is set by the UAE and paid by the buyer, so it is worth asking your customs agent or freight team how they want the paperwork addressed.

Plan the arrival as carefully as the order. Most towers and communities have management rules on working hours and deliveries, so check with yours and book a slot. Store everything sealed, shaded and indoors, ideally in an air conditioned room, and never in a vehicle or on the roof while other trades finish.

Stage five, handing over leftover material

At the end of the job, the leftover tinted plaster and wax should go to whoever looks after the building, labelled and stored with the approved boards. For a hotel or a tower, that is usually the facilities team. Those few tubs make small repairs straightforward and give any future order a clear reference to match.

Questions about Venetian plaster project orders in the UAE

Can one project order cover several finishes and colours?

Yes. A single order can combine Venetian plaster, Stucco Suede, Travertino and Tadelakt, each in its own approved colour. We tint and label each separately, then pack the set as one tracked consignment so the site receives everything together.

Do you supply Abu Dhabi and Dubai projects in the same way?

Yes. The process is identical for every emirate. Only the delivery quote changes, because it depends on the address, the weight and the number of tubs. Import duty or tax is set by the UAE in each case and paid by the buyer.

Can Zavoré install as well as supply on a UAE project?

We can. Our own artisans install in every emirate, and some projects mix the two, with our team on feature areas and the contractor's applicators on the rest. Tell us at enquiry stage which route you are considering.

Send drawings, a finishes schedule and the site address to sales@zavore.co.uk, or call +44 7592 929191 between 9am and 6pm UK time, Monday to Saturday. We will reply with products, quantities and the sample boards to order first.

Back to the Journal

Providing luxury finishes for the most prestigious addresses in the world

Venetian plaster, limewash, microcement, tadelakt, metallics, sculptural plaster and gold leaf, supplied and installed by our own team, with Venetian plaster taught at our Birmingham studio.

PayPal
© 2026 Zavoré Ltd · Est. 2021 · Made to order in Birmingham
For The Trade Three ways to earn with us
Trade accountTen percent off every material in the shop, and a specialist on the phone. Partners & affiliatesGet listed where customers find you, or sell our materials and earn on every order. The Rewards RoomEvery order earns. Samples, tools and an apron, on the house.
Free to join · we reply within 24 hours
FR