


Short answer. Before the applicators arrive, clear the room of small items, agree what furniture stays, make sure other trades have finished their messy work, and check the walls are dry. Keep the heating on gently so the room is at a normal temperature. We protect floors and fittings ourselves, but a clear, warm room lets the team start straight away.

This is not the same job as preparing the wall itself. If you are doing that part, our guide to preparing walls for Venetian plaster covers primers and surfaces in detail.
Our team protects floors, skirtings, sockets, window frames and anything that stays in the room, then checks the walls once more before starting. Tell them about anything you are worried about, such as a delicate floor or a doorframe you want kept clean.
Keep the room at a normal living temperature. A cold room slows drying, and very hot, dry air from a heater pointed at the wall can make a finish dry unevenly. Leave the heating on low and let the room breathe.
At the end of each day the team leaves the room protected. However tempting it is, try not to go in and touch the walls to see how they are drying. If you need to pass through, keep clear of the walls and keep doors closed, so dust from the rest of the house stays out of the room.
Applicators need a tap for clean water and somewhere to wash tools, ideally outside or in a utility room rather than the kitchen sink. A power socket for mixers is useful. If parking is tight, let us know before the start date, as the team arrives with tubs and kit.
Each finish has its own needs, which we explain at the site visit. Our microcement installation page, for example, covers what a floor needs before it can be laid.
If you have dates in mind, call 07592 929191 or email sales@zavore.co.uk and we will talk you through what your room needs. You can still order a sample board if you are choosing a colour, and see what we install on our installation page.
No. Small and fragile items should go, but large furniture can be moved to the middle and covered by our team.
Yes, most people do. The room being finished is out of use while the work is going on.
Yes. A fresh skim must be fully dry before a decorative finish goes over it, or the finish can be affected.
How painting companies in Dubai can order Lime Paint for villa repaint work, with colours tinted room by room, labelled tubs and tracked ...
ContractorsHow plastering contractors can add microcement, tadelakt, limewash and Venetian plaster through Zavoré 1 to 1 Training, group courses of ...
Abu DhabiIf you searched for Venetian plaster paint for a villa in the UAE, here is what we actually supply, which real plaster to order instead a...
CoursesWhat three days on the Zavoré tadelakt course involve, from the base and radiused corners to the burnishing window, the stone, the soap a...
CoursesAn honest look at general plastering courses against the Zavoré Beginner Course in Venetian plaster at our Manchester centre, who each su...
Abu DhabiWhere Venetian plaster belongs in an Abu Dhabi villa bathroom, which finish takes over in the wet zone, and how the walls are sealed, sur...
Providing luxury finishes for the most prestigious addresses in the world
Venetian plaster, limewash, microcement, tadelakt, metallics, sculptural plaster and gold leaf, supplied and installed by our own team, with Venetian plaster taught at our Birmingham studio.
One list, run by the people who make the material. No noise, and nothing we would not want to read ourselves.
We email as the house has something worth saying, never daily. Unsubscribe from any email, or reply STOP to any text. We never pass your details to anyone.