Short answer. Decorative plaster is one of the last finishes in a renovation, after building work, wiring, plumbing and skimming are done and dry. It usually goes on before the final fittings such as socket faceplates, mirrors and shelves. Zavoré works alongside builders, architects, designers and main contractors, so the timing should be agreed with them early.
A rough order for most rooms looks like this.
Every job is a little different, which is why we like to talk to your builder before dates are fixed.

A decorative finish shows the wall underneath it. Ask your builder or plasterer for a flat, sound skim with no ridges or patches, and let it dry properly. If the wall is not flat enough, we will say so on our visit rather than plaster over the problem.
It also helps to agree where heavy fixings will go. Walls due to carry a television, cabinets or a large mirror are much easier to plan before the finish goes on. For floors, any screed must be dry and any underfloor heating run and tested before microcement is laid.
Plaster finishes do not mix well with dust and knocks. Once our team starts, the room should be free of sanding, cutting and heavy traffic until the finish is dry. If other trades must work nearby, a simple plan for who is where and when saves damage. We protect the space while we work, but a wet wall cannot be protected from a ladder swung into it.
Painting needs a plan too. If your decorator is painting ceilings, doors and skirtings, agree the order with us. Ceilings are usually painted before the finish goes on, so drips cannot land on a finished wall. Skirtings and doorframes are often painted afterwards, with care at the edge where the woodwork meets the plaster.
On larger projects we work alongside your architect, interior designer or main contractor and plan our work around their programme. Finish and colour are still agreed on a sample before work begins, and that sample is what the finished wall is checked against. Our page on Venetian plaster for interior designers covers how to specify it.
If you are tiling one part of a bathroom and want tadelakt or microcement in another, the waterproofing and the join between the two need agreeing between trades before either starts. Our tadelakt installation page explains what a wet area needs.
If your builder is setting dates now, call 07592 929191 or email sales@zavore.co.uk so we can fit in with the programme. Order a sample board to agree the colour early, and see every finish on our installation page.
Usually after the units are in and before the splashback fittings, but it depends on the design. Agree the order with us and your fitter before work starts.
Ask us at the site visit. We will tell you what preparation the walls need and how to get it done.
Yes. We work alongside architects, designers and main contractors on residential and commercial projects, planning around their programme.
How painting companies in Dubai can order Lime Paint for villa repaint work, with colours tinted room by room, labelled tubs and tracked ...
ContractorsHow plastering contractors can add microcement, tadelakt, limewash and Venetian plaster through Zavoré 1 to 1 Training, group courses of ...
Abu DhabiIf you searched for Venetian plaster paint for a villa in the UAE, here is what we actually supply, which real plaster to order instead a...
CoursesWhat three days on the Zavoré tadelakt course involve, from the base and radiused corners to the burnishing window, the stone, the soap a...
CoursesAn honest look at general plastering courses against the Zavoré Beginner Course in Venetian plaster at our Manchester centre, who each su...
Abu DhabiWhere Venetian plaster belongs in an Abu Dhabi villa bathroom, which finish takes over in the wet zone, and how the walls are sealed, sur...
Providing luxury finishes for the most prestigious addresses in the world
Venetian plaster, limewash, microcement, tadelakt, metallics, sculptural plaster and gold leaf, supplied and installed by our own team, with Venetian plaster taught at our Birmingham studio.
One list, run by the people who make the material. No noise, and nothing we would not want to read ourselves.
We email as the house has something worth saying, never daily. Unsubscribe from any email, or reply STOP to any text. We never pass your details to anyone.