Construction companies in Oman that add a decorative plaster wall to a villa, hotel or office tend to ask one practical question first, which is where the work belongs in the build programme. Zavoré installs lime based Venetian plaster anywhere in Oman with our own artisans, and the short answer is late in the job, after the wet and dusty trades, but before final fix joinery and floor protection.
This guide is for main contractors, site managers and project teams. It sets out the order of trades, the state the wall has to be in, and who approves what. How a job runs from survey to handover is explained on our Venetian plaster installation page, the boards and colour references a design team needs are gathered on our page for specifiers, and the picture for the whole country is on Venetian plastering in Oman.
Treat Venetian plaster, marmorino and polished plaster as a finishing trade that behaves more like fine joinery than paint. It goes on in thin coats, each left to dry before the next, and the last coat is burnished and then waxed or sealed. Anything that throws dust, splashes water or knocks the surface after that point puts the finish at risk. So the package normally starts once the building is weathertight, services are first fixed and tested behind the wall, the background has been skimmed or rendered, and the room has had time to dry.
On site we ask for the noisy, dirty jobs in that room to be complete. Ceiling boards, cornice, cable chases, tile cuts and any sanding of doors or frames should be done. Once our artisans begin, the room works as a clean zone until the finish is handed back.
Lime breathes and suits solid masonry, which is welcome news on a block and render villa. Plasterboard partitions work too, but the joints need reinforcing and the right primer, or a crack line can show through a polished surface later.
When the final coat is burnished, the wall is waxed or sealed to suit the finish and the room. From then on the plaster copes well with normal use, yet on a busy site it is still exposed to ladders, trolleys, tape and wet trades. We suggest that skirting, door linings, ironmongery, sanitaryware and floor protection go in after the plaster, fitted with care around it. Only use low tack protection once the wall has cured, and never put strong tape straight onto a fresh finish.
If a section is damaged before handover, call us rather than patching it. Lime finishes can often be repaired, but a burnished surface rarely forgives a touch up in the wrong material, so keep back a little of the tinted plaster from the job.
Most trouble on a decorative plaster package starts in the background rather than the plaster. Before we begin, we check for four things.
We talk through the building, the climate and how the room is used at the survey. Rooms are air conditioned once a building is occupied, and it helps to know early whether the cooling will run while the coats go on.
A decorative finish is approved by eye, so the approval route has to be clear from the start. We prepare a sample in the chosen finish and colour, from 48 house colours or any NCS reference, and one named person on the client or design side approves it in writing. The plaster for the job is tinted to that sample, and every wall is judged against it. On larger projects, agree in the contract who holds the sample, where it lives on site, and who may approve a change.
Designers and architects can order boards and a colour reference through the specifier page, and a single sample board is the simplest first step for a one room package.
There are two routes. The first is a full installation package. You send photos, drawings and rough measurements, we survey before giving any price, a sample is approved, and dates are agreed. The work is planned in blocks of days so the same artisans stay on the job from priming to the final burnish, which matters on long walls that have to be finished in one pass. We do not give durations up front, because the background, the finish and the number of rooms decide the plan, and we confirm it after the survey.
The second route suits contractors with applicators of their own. We can send plaster materials from the UK, tinted to the approved sample, on a tracked service. Delivery is quoted individually, and any import duty or tax is set by Oman and paid by the buyer. Most communities, towers, malls and hotels have rules on working hours and deliveries, so check with yours before dates are fixed.
It can, and often it should, as long as the floor work that follows throws no dust or water at the walls. If a stone or tiled floor needs grinding or wet cutting in the room, that is better done first, with the finished floor protected while our artisans work.
Usually, yes. We prefer to prime as part of our package, because the primer has to suit both the background and the finish chosen. If your team has already primed, tell us the product used and we will say at the survey whether it can stay.
We can share a building, but not a room in its final stages. While coats go on and are burnished, the room needs to stay clean, quiet and free of dust. We plan the blocks of days with your site manager so each area is handed over ready.
Yes. Our own artisans install anywhere in Oman, from Muscat and Sohar to Nizwa, Sur, Duqm and Salalah. Send photos, drawings and the location, and we will arrange a survey before any price is given for the package.
To plan a package, ring +44 7592 929191 (Monday to Saturday, 9am to 6pm UK time) or email sales@zavore.co.uk with photos, drawings, rough measurements and the location of the project.
Sculptural plaster waves, geometric facets and carved stone for Abu Dhabi tower lobbies, drawn to scale, sampled and planned with lightin...
MajlisHow to order gold paint and metallic plaster for a majlis in Oman. What Perla Gold, Perla Sabbia Gold and Veneziano Metallico are, and ho...
Abu DhabiReal gold, silver and copper leaf laid by hand on entrance domes, alcoves and niches in Abu Dhabi villas, with oil gilding and a sample b...
Bas ReliefA sculpted plaster wall greets guests as they arrive. How bas relief suits Muscat villa entrance halls and stair walls, from the first sk...
OmanApplicators and painters from Oman can learn Venetian plaster on our 3 day Beginner Course in England, then move on to the 4 day Advanced...
InstallationLimewash in place of flat emulsion for Seeb villas. Where it works, what the wall must be made of, how it ages and how our artisans plan ...
Providing luxury finishes for the most prestigious addresses in the world
Venetian plaster, limewash, microcement, tadelakt, metallics, sculptural plaster and gold leaf, supplied and installed by our own team, with Venetian plaster taught at our Birmingham studio.
One list, run by the people who make the material. No noise, and nothing we would not want to read ourselves.
We email as the house has something worth saying, never daily. Unsubscribe from any email, or reply STOP to any text. We never pass your details to anyone.