ZAVORÉ
ZAVORÉ
✦
Where Artistry Begins
Tracked delivery across the UK and worldwide·Same day and 24 hour delivery available·Venetian plaster tinted to your exact colour·Damaged in transit? We’ll replace it within 24 hours or on the same day·Speak to a specialist · 07592 929191·Residential and commercial projects installed by our own team·Trade accounts · 10% and rewards·Training courses at our studio·Showroom · visit by appointment·Tracked delivery across the UK and worldwide·Same day and 24 hour delivery available·Venetian plaster tinted to your exact colour·Damaged in transit? We’ll replace it within 24 hours or on the same day·Speak to a specialist · 07592 929191·Residential and commercial projects installed by our own team·Trade accounts · 10% and rewards·Training courses at our studio·Showroom · visit by appointment·
Home/The Journal/Underfloor Heating and Seamless Floors in London Homes
13 November 2026

Underfloor Heating and Seamless Floors in London Homes

A grey concrete surface with subtle mottling, the look of a seamless microcement floor laid over underfloor heating

Yes, a microcement floor can go over underfloor heating in a London home, and the two suit each other well because a thin mineral finish lets warmth through quickly. Zavoré installs microcement floors across London. Success depends on the order of work. The screed must be properly dry, the heating should be commissioned before the finish goes down, movement joints must be respected, and the heating is brought back up slowly afterwards.

Our page on microcement installation explains how floors are prepared, laid and sealed. For the London areas we cover, from kitchen extensions in Victorian terraces to lateral apartments, see Venetian plastering in London.

  • The screed has to dry fully, and drying time depends on its type, thickness and the conditions.
  • Run the heating through its commissioning cycle before microcement goes down, not after.
  • Movement joints in the screed must be carried through or honoured in the finish.
  • After laying, raise the heating gradually, following the guidance of your heating and screed suppliers.
  • Rugs and heavy furniture over warm floors trap heat, so plan the layout.

Why do microcement floors and underfloor heating go together?

Microcement is laid in thin coats directly over the screed, so there is very little between the pipes or mats and your feet. Heat passes through quickly and the floor warms evenly. Unlike timber, it does not shrink or gap as it warms and cools, and unlike large format tiles there are no grout lines to crack. In open plan kitchen extensions, common at the back of London terraces, a single seamless floor running from kitchen to garden doors is one of the main reasons people choose it.

How long does the screed need to dry before microcement?

It depends. Traditional sand and cement screeds and flowing screeds dry at different rates, and thickness, ventilation, weather and whether the windows are in all change the timing. A new extension in a cold, damp London winter dries more slowly than one finished in summer.

The screed maker publishes drying guidance, and a moisture test before laying is the reliable check. Laying microcement on a screed that is still releasing moisture risks poor adhesion, blistering and cracking. We ask about the screed type and the date it was laid at the survey, and we set dates around it.

Do I need to run the heating before the floor is laid?

Yes, in almost every case. Commissioning means bringing the heating up through a planned cycle, as set out by your heating engineer and the screed supplier, then bringing it back down. It drives out residual moisture and, importantly, lets the screed move and crack now, while those cracks can still be repaired, rather than after the finish is down.

Once the screed has been commissioned and any cracks dealt with, the heating is turned down or off for laying. Microcement needs a stable surface temperature while it is applied and while it cures.

What about movement joints?

Large screeds and screeds over underfloor heating often include movement joints, especially at doorways, between heating zones and in long, narrow rooms. These let the screed expand and contract without cracking. A seamless finish laid straight over a movement joint will crack along it eventually.

So joints are either carried through the microcement as a fine line, positioned where they look deliberate, or the screed design is planned from the start so joints fall under doors and kitchen units. Talk to your builder and screed installer early.

How should the heating be used after the floor is finished?

  • Leave the heating off or low until the microcement and sealer have fully cured, as advised at handover.
  • Bring it back up gradually over several days rather than switching straight to full.
  • Avoid sudden large changes in temperature, especially in the first heating season.
  • Do not lay thick rugs or rubber backed mats over heated areas without checking the heating guidance.

Hairline marks in the first months usually come from heating turned up too fast or a screed that was not fully dry.

Which London homes is this most common in?

Kitchen and garden room extensions on Victorian and Edwardian terraces in Fulham, Clapham, Islington and Hampstead are the classic case, with a new screed and underfloor heating laid in one go. Lateral apartments and new build towers often have heated screeds already. Basement conversions in Kensington and Belgravia can include them too, though basements bring their own damp proofing questions that need answering first.

In flats, many leases need the freeholder's permission for alterations, including changes to floors, so check yours. Some buildings also have rules about sound insulation under hard floors.

New to the material? Read our full guide to what microcement is and where it works, and when you are ready to find the right team, our guide to Venetian plasterers in London.

For a traditional lime floor, see pastellone floors and how they are laid.

Questions about underfloor heating and seamless floors

Can microcement go over existing heated tiles?

Often, yes, if the tiles are firmly bonded and the floor beneath is stable. Grout lines are filled, the tiles keyed and primed, and a mesh is laid in the base coats. The heating should be off during laying and brought back up slowly afterwards.

Will the floor crack with underfloor heating?

Not if the screed is dry, the heating commissioned first, joints respected and temperatures raised gradually. Cracks almost always trace back to one of those steps being missed rather than to the microcement itself.

Does it work with electric mats as well as water pipes?

Yes. Electric mats are common in bathrooms and smaller rooms, and the same principles apply. The mat is covered with a suitable levelling layer or screed, and that layer must be dry and stable before the finish goes on.

To plan a seamless floor over underfloor heating in London, send photos, drawings, rough measurements and the address to sales@zavore.co.uk or call +44 7592 929191, Monday to Saturday, 9am to 6pm. We survey before any price and confirm timing once we know the screed.

Keep reading

More from the Journal

Back to the Journal

Providing luxury finishes for the most prestigious addresses in the world

Venetian plaster, limewash, microcement, tadelakt, metallics, sculptural plaster and gold leaf, supplied and installed by our own team, with Venetian plaster taught at our Birmingham studio.

PayPal
© 2026 Zavoré Ltd · Est. 2021 · Made to order in Birmingham
For The Trade Three ways to earn with us
Trade accountTen percent off every material in the shop, and a specialist on the phone. Partners & affiliatesGet listed where customers find you, or sell our materials and earn on every order. The Rewards RoomEvery order earns. Samples, tools and an apron, on the house.
Free to join · we reply within 24 hours
DE