ZAVORÉ
ZAVORÉ
✦
Where Artistry Begins
Tracked delivery across the UK and worldwide·Same day and 24 hour delivery available·Venetian plaster tinted to your exact colour·Damaged in transit? We’ll replace it within 24 hours or on the same day·Speak to a specialist · 07592 929191·Residential and commercial projects installed by our own team·Trade accounts · 10% and rewards·Training courses at our studio·Showroom · visit by appointment·Tracked delivery across the UK and worldwide·Same day and 24 hour delivery available·Venetian plaster tinted to your exact colour·Damaged in transit? We’ll replace it within 24 hours or on the same day·Speak to a specialist · 07592 929191·Residential and commercial projects installed by our own team·Trade accounts · 10% and rewards·Training courses at our studio·Showroom · visit by appointment·
Home/The Journal/Microcement Bathroom Installation in Sharjah Villas and Apartments
27 November 2026

Microcement Bathroom Installation in Sharjah Villas and Apartments

A modern bathroom with a seamless finish around the bath, basin and shower, the look a microcement bathroom brings to a Sharjah home

A microcement bathroom in Sharjah replaces a grid of tiles and grout with one continuous surface across the floor, the walls and the shower, laid by hand in thin coats and sealed. Zavoré installs it in Sharjah villas and apartments, and anywhere in the UAE, with our own artisans. The work always starts with photos of the room and a survey of what lies underneath.

How the material behaves on floors, walls and worktops is set out on the microcement page, while microcement in Sharjah covers the emirate more widely, from family homes to apartment blocks. This post stays inside the bathroom.

  • No grout lines, so a floor can turn up the wall and into the shower without a single tile edge.
  • It can often go over existing tiles once loose ones are lifted and the joints filled and reinforced.
  • The base must be sound, and a screed must be dry right through.
  • The sealer is what makes the surface washable; the wall behind the shower still needs tanking.
  • Colour and sheen are approved on a sample before dates are set.

Why a microcement bathroom suits Sharjah homes

Where an apartment bathroom is tiled floor to ceiling in large ceramic or porcelain, it is the joints that take the most cleaning. Going over those tiles, once they have been checked and prepared, changes the room without a full strip out. In a villa, where there may be several bathrooms and a shower room by the pool, the same calm surface can carry from one to the next so the house feels consistent.

The finish also suits the details bathrooms are full of. Shower benches, niches and reveals can be wrapped in one skin, and a vanity top or a splashback can match the walls. Whether the home is in the city or on the Sharjah east coast at Kalba or Khor Fakkan, the approach is the same, starting with what is on the walls and floor now.

What the base needs before the first coat

Think of the finish as a skin only a few coats thick. It copies whatever is beneath it, so a wobbly tile or a damp screed will eventually show. Old tiles stay only if every one is bonded tight; we clean off grease, abrade the glaze for grip, take out any that sound hollow and repair the gaps, then pack and mesh the joints so the old grid cannot telegraph through. A freshly poured screed has to have dried out fully in its depth, which takes patience.

Structural movement joints are honoured in the new surface instead of being skimmed over. If a floor flexes underfoot, the flexing is cured before anything else, as no thin coating will span it. Hairline cracks in seamless finishes almost always come from a base that shifted, so we would rather see the room than guess.

Showers, tanking and the sealer

It is worth knowing that cement alone is not the waterproof part. The protective topcoat, the sealer, is what lets you wipe the walls down and shrug off splashes. Behind any shower, a proper tanking layer still goes on first, just as a tiler would fit one. For the shower itself, tadelakt over a waterproofed wall is the other suitable finish, and Venetian plaster is kept for the dry walls elsewhere in the room.

Outside the shower, the same sealed surface runs across the floor and onto a vanity top, which is where the absence of joints is most noticeable from one day to the next.

How long does a microcement bathroom take?

That depends almost entirely on what the survey finds, so we never quote a duration from photographs. The sequence is predictable, though. First the survey, then a sample of colour and sheen for you to sign off, then the preparation of tiles or screed, then each thin coat with time to dry before the next, and finally the protective seal. Because a floor must be worked wet from wall to wall without a break, the size of the crew is fixed beforehand, and the booking is made as blocks of days so one crew carries the room from start to finish.

How the job runs in Sharjah

  1. Share photographs of the bathroom, a floor plan if you have one, and approximate sizes.
  2. One of us visits to inspect the tiles, screed and walls.
  3. Only after that visit do we put a price on paper.
  4. Once you sign off a sample, we fix the dates together.
  5. Preparation, coats and sealing follow in blocks of days, and the room is handed back ready to use.

Homes here are air conditioned, and the survey is where we discuss the building, the climate and how the bathroom will be used. Most towers and communities have management rules on working hours and deliveries, so check those with your building office, and tenants should clear the work with the landlord before booking, because the new finish is bonded over the existing tiles or screed.

Learning the craft

A decorator wanting to master it can do so on the microcement course, which runs as 1 to 1 Training at our centres in England. For the full sequence of an installation, see the microcement installation page.

Questions about a microcement bathroom in Sharjah

Can the old tiles stay under a microcement bathroom?

Often they can, provided each tile is bonded tight. We clean, abrade and repair them, take out any hollow ones and pack the joints with mesh. Where the floor itself is flexing, the tiles are removed instead. The survey settles which way it goes.

Does the shower still need waterproofing?

Yes. The sealer protects the face of the finish and lets it be wiped clean, but a tanking layer behind the shower walls is still fitted first, the same as for a tiled shower.

Why do seamless floors sometimes crack?

Because something under them moved. Laid on a stiff, fully dry and well prepared base, with the building's movement joints respected, the surface stays intact. That is the reason we inspect before pricing.

Do you install outside Sharjah city?

Yes. Our own artisans work across the emirate, including Kalba and Khor Fakkan on the east coast, and in every other emirate too. Photos and approximate room sizes are enough to start.

For a Sharjah bathroom, write to sales@zavore.co.uk with photographs, the room sizes and the address, or call +44 7592 929191 between 9am and 6pm UK time, Monday to Saturday.

Keep reading

More from the Journal

Back to the Journal

Providing luxury finishes for the most prestigious addresses in the world

Venetian plaster, limewash, microcement, tadelakt, metallics, sculptural plaster and gold leaf, supplied and installed by our own team, with Venetian plaster taught at our Birmingham studio.

PayPal
© 2026 Zavoré Ltd · Est. 2021 · Made to order in Birmingham
For The Trade Three ways to earn with us
Trade accountTen percent off every material in the shop, and a specialist on the phone. Partners & affiliatesGet listed where customers find you, or sell our materials and earn on every order. The Rewards RoomEvery order earns. Samples, tools and an apron, on the house.
Free to join · we reply within 24 hours
DE