Microcement gives a Muscat bathroom or floor one continuous surface with no grout lines, laid by hand in thin coats over a sound base and finished with a sealer. Zavoré installs microcement anywhere in Oman with our own artisans, whether the room is an apartment bathroom in Al Khuwair or the ground floor of a villa in Bawshar. Each job starts from photographs and a survey of the floor, never a guess.
What the material is and the surfaces it covers are explained on our microcement page, and the finishes that sit beside it in the capital are gathered on the page for microcement in Muscat. This post keeps to bathrooms and floors, which is where most questions begin.
The strongest uses are bathrooms and wet rooms, shower benches and niches, kitchen worktops and splashbacks, stair treads and whole floors. In a compact apartment bathroom, wrapping the floor, the walls and a bench in one skin makes the room feel larger and quieter than a grid of tiles, and there are no joints to scrub. In a villa, one floor can run from the hall through to the kitchen without a change of surface at each doorway, which suits open, bright rooms.
A stair in the same finish as the hall floor ties the two levels together. Treads need the same careful base as any floor.
A seamless coating is honest about what lies below it, so preparation is where the effort goes. The base must be rigid and sound. A screed must be dry right through, not merely on its surface. Tiles must be firmly stuck, degreased and keyed, and any hollow or loose ones are lifted and made good before the grout lines are filled and the surface reinforced.
If a floor still moves, that is put right first, because no thin finish can bridge movement. Cracks in this kind of surface nearly always trace back to something shifting underneath, which is exactly why we survey before quoting and say plainly if a floor needs work.
The cement itself is not what keeps water out. The sealer makes the surface washable and resistant, while the wall behind the shower still needs proper tanking, done as carefully as it would be under tile.
Tadelakt on a waterproofed wall is the other finish that belongs in a shower. Venetian plaster does not, though it can sit happily on a dry wall elsewhere in the same bathroom.
We do not give a figure before seeing the room, because the base decides most of the work. In planning terms, the sequence is a survey, approval of a sample in your chosen colour and sheen, preparation of the base, then the coats with drying time between them, and finally the sealer. A floor has to be laid wet across the whole room in one go, so the number of hands is planned in advance and the work is booked in blocks of days with the same artisans through every coat.
Rooms in Muscat are usually air conditioned, and we talk through the building, the climate and how the room is used at the survey. Most communities, towers, malls and hotels have rules on working hours and deliveries, so check with yours. If you rent, ask your landlord first.
For a decorator who wants the skill rather than the finished room, the microcement course is taught in person in England on our 1 to 1 Training. The stages of an installation are also set out on our microcement installation page.
Usually, if the tiles are firmly stuck. They are degreased and keyed, loose ones are lifted and made good, and the grout lines are filled and reinforced before the coats go on. If the floor beneath is moving, the tiles come up instead. We confirm which route applies at the survey.
The sealer makes the surface washable and resistant to water, but it does not replace tanking. The wall behind a shower is waterproofed first, exactly as it would be for tile, and the microcement goes over that.
It cracks when the base underneath moves. On a rigid, dry and properly prepared floor it stays sound, which is why the survey comes before any price and why we say if a floor needs work first.
Yes. Our own artisans install it anywhere in Oman, from Seeb and Sohar to Nizwa and Salalah. Start with photographs and rough measurements, and we will arrange a survey of the floor.
To talk about a bathroom or floor, ring +44 7592 929191 (Monday to Saturday, 9am to 6pm UK time) or email sales@zavore.co.uk with photos, rough measurements and the location of the property.
How a true lacquered wall differs from lacquer paint from a tin, and why many thin coats, careful preparation and a colour sample suit Du...
Abu DhabiA sculpted plaster wall behind the reception desk gives an Abu Dhabi office a face. How a carved motif or brand mark is designed, approve...
InstallationLime based Venetian plaster and marmorino for Nizwa villas, from the majlis to the stair hall, with honest notes on walls, rooms and how ...
Clay PlasterThe soft roman clay look for Sharjah villa bedrooms, made in lime with Intonachino, Stucco Suede or Lime Paint, and why raw clay is not u...
GuidesA room by room guide to wall design in Omani villas, matching Venetian plaster, marmorino, limewash and tadelakt to how each room is used.
Abu DhabiA plain guide to lime wash paint for UAE homes. What real limewash is, the mineral walls it needs, why it is not washable and how to look...
Providing luxury finishes for the most prestigious addresses in the world
Venetian plaster, limewash, microcement, tadelakt, metallics, sculptural plaster and gold leaf, supplied and installed by our own team, with Venetian plaster taught at our Birmingham studio.
One list, run by the people who make the material. No noise, and nothing we would not want to read ourselves.
We email as the house has something worth saying, never daily. Unsubscribe from any email, or reply STOP to any text. We never pass your details to anyone.